Prepared exclusively for this project
Grenada Street
G · R · E · N · A · D · A
Backyard Interlocking & Sod Replacement
A complete exterior transformation — designed before construction begins. Every figure below is transparent, every item is optional, and nothing is locked in until you approve.
Project Details
Project Address
Grenada Street
Scope
Backyard Interlocking & Sod
Prepared By
Taishan Construction
Status
Awaiting Your Approval
Scope of Work
Each item below explains what is included — and why it matters to the finished result.
Backyard Interlocking
- —Excavation and removal of the existing surface to the required depth.
- —Subgrade grading with positive drainage away from the home.
- —Compacted granular base and bedding layer — the foundation of a paver surface that never shifts.
- —Paver installation with edge restraint, joint sanding, and final compaction.
- —Full site cleanup before handover.
Sod Replacement
- —Removal of the existing lawn and overgrowth in the designated area.
- —Soil preparation and amendments for healthy root establishment.
- —Final grading for a smooth, even lawn surface.
- —Supply and installation of fresh sod.
- —Watering guidance so the new lawn takes and thrives.
Before & After
Site photos against the renders. Drag the handle to see Grenada Street transformed.




Investment Summary
Every item is optional — toggle anything out and your total updates instantly. For the interlocking, choose one: standard pavers or premium XL slabs.
Remove the agreed surface; prepare subgrade, base and bedding; install pavers with edge restraint; joints, compaction and cleanup.
$16 / sq ft
Large-format XL slabs, the same specification used at 60 Carsile. Removal and haul-away of excavated dirt; subgrade grading, compacted granular base and bedding; slab installation with edge restraint; joints, compaction and cleanup.
$22 / sq ft
1 extended step + 1 standard step. Prepare support, install riser and tread courses, finish exposed ends.
$1,000 flat
Demolition of the existing deck and removal of overgrown garden plants, including haul-away and cleanup.
$600 flat
Every item is optional, and the interlocking is one or the other — standard pavers or premium XL slabs. Nothing is locked in until you approve.
Tailored Timeline
A disciplined path from vision to completion. Final dates are confirmed together at approval.
Approximately 4–5 days on site
Approval & Scheduling
Before Day 1Once you approve, we confirm dates, order materials, and book the project window.
Site Preparation
Day 1Deck demolition, plant removal, excavation, and grading. Everything beneath the surface is handled here.
Construction
Day 2–4Base preparation, interlocking installation, and entrance step rebuild — built to spec, checked at every stage.
Lawn & Handover
Day 5Sod installation, final grading, complete cleanup, and a walkthrough of your finished backyard.
The Taishan Effect
See It Before You Build It
3D visualization before construction begins.
Built Properly
Proper excavation, grading, drainage, base preparation, and installation.
Warranty-Backed Workmanship
Confidence after completion.
Clear Communication
One organized team from concept to completion.
Confidence before we build.